Earlier work (2025–2026). GridVision now focuses on data-center site advancement and cross-gate coordination for controlled sites in Northern Virginia. The interconnection-queue research below is kept for reference and retains the vocabulary of the period in which it was written; it is not a current product.

Interconnection queues

Interconnection queues by ISO/RTO

How each market's interconnection process works today, and what the public queue record shows at the points of interconnection GridVision has read one by one.

Nationally, 13% of the capacity that requested interconnection from 2000 to 2020 had reached commercial operation by the end of 2025, 75% had withdrawn, and about 2,060 GW was still seeking interconnection (Berkeley Lab, Queued Up: 2026 Edition).

Updated September 18, 2026

Market guides

Market-wide queue vintages

Where the public dataset does not name a point of interconnection, GridVision reads the record by the year requests were filed.

Data

By state

The same record read by where the point of interconnection sits. A state has a page when the dataset carries at least 100 usable requests for it; the downloadable CSV covers every state, including the two below that line.