Earlier work (2025–2026). GridVision now focuses on data-center site advancement and cross-gate coordination for controlled sites in Northern Virginia. The interconnection-queue research below is kept for reference and retains the vocabulary of the period in which it was written; it is not a current product.

Interconnection queue data

Mississippi interconnection queue

425 interconnection requests have been filed at points of interconnection in Mississippi since 2000, totalling 106 GW. Of that capacity, 8.4% reached commercial operation and 75.6% withdrew.

GridVision AI ResearchPublished Updated

Headline figures

106 GW
of capacity requested in Mississippi since 2000
8.4%
of it reached commercial operation; 75.6% withdrew
49 GW
filed in the last six years (273 requests), of which 32.1% is still in the queue

Which markets Mississippi requests sit in

A state is a location, not a market. Requests at Mississippi points of interconnection are studied by the market that runs the queue there, and the process differs between them.

MarketRequestsCapacity filedReached operationWithdrewOutcome by capacity
Southeast21568 GW11.6%82.2%
MISO21039 GW2.8%64.2%

Process pages: MISO.

By resource type

ResourceRequestsCapacity filedReached operationWithdrewOutcome by capacity
Solar23834 GW2.3%72.7%
Hybrid6812 GW0.0%79.8%
Other4942 GW16.2%83.8%
Battery324 GW2.6%48.0%
Gas2612 GW10.0%61.2%
Wind123 GW0.0%67.7%

Hybrid covers requests the dataset records as a combination, such as solar plus battery.

By year filed

  • 200010 GW
  • 20012 GW
  • 2002929 MW
  • 20031 GW
  • 2008640 MW
  • 2010222 MW
  • 2011350 MW
  • 201270 MW
  • 201396 MW
  • 2014293 MW
  • 2015281 MW
  • 20162 GW
  • 20172 GW
  • 20185 GW
  • 20194 GW
  • 20205 GW
  • 20215 GW
  • 202217 GW
  • 20236 GW
  • 202411 GW
  • 20255 GW

Recent years are unsettled: requests filed in the last few years may still be built or withdrawn.

Points of interconnection with the most requests

  • INDIANOLA 230/115 SUB - TILLATOBA 230.0kV6 requests in the dataset
  • INDIANOLA 230/115 SUB - MCADAMS EHV 230.0kV4 requests in the dataset
  • Eaton - Lucedale 115 kV Line4 requests in the dataset
  • Hattiesburg Southwest - Adams Creek 230 kV LIne4 requests in the dataset
  • WOLF CREEK 500 kV3 requests in the dataset
  • LAKEOVER EHV - MCADAMS EHV 500.0kV3 requests in the dataset

Names are as the dataset records them, so spelling variants of one station can appear separately.

Published retrospectives in Mississippi

Method and limits

Each request is counted once, at the capacity and status the dataset records for it, and placed in the state the dataset gives for its point of interconnection. Requests missing a state, status, filing year or capacity are left out. The dataset records outcomes and dates, not reasons, so nothing here says why a request withdrew, and no share is a rate to plan against.

For the same record filtered your own way, use the queue explorer; for national tables and time-to-build figures, see queue statistics.

Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition, data file through 2025, CC BY 4.0. Computed September 18, 2026.

Have a controlled site and a next gate?

GridVision qualifies a limited number of Northern Virginia data-center sites for a Site Evidence Record and 90-Day Gate Closure Plan. The public form collects contact details only.

Request a qualification conversation

Do not send site records, confidential information, or transaction documents through the public form.