Earlier work (2025–2026). GridVision now focuses on data-center site advancement and cross-gate coordination for controlled sites in Northern Virginia. The interconnection-queue research below is kept for reference and retains the vocabulary of the period in which it was written; it is not a current product.

Interconnection queue data

Interconnection queue explorer

Pick a market, a resource and a range of filing years. The figures below are counts and capacity sums over 37,509 interconnection requests in Berkeley Lab's Queued Up: 2026 Edition dataset. Your filters go into the page address, so a selection can be shared or cited as it stands.

GridVision AI ResearchPublished Updated

Explore the queue data

Market
Resource
37,217
interconnection requests in this selection
6,539 GW
of capacity requested
7.3%
of that capacity reached commercial operation; 64.0% withdrew

By year filed

  • 2000128 GW
  • 2001167 GW
  • 200260 GW
  • 200361 GW
  • 200459 GW
  • 200590 GW
  • 2006160 GW
  • 2007274 GW
  • 2008264 GW
  • 2009108 GW
  • 2010119 GW
  • 2011125 GW
  • 201290 GW
  • 201384 GW
  • 2014126 GW
  • 2015144 GW
  • 2016209 GW
  • 2017237 GW
  • 2018309 GW
  • 2019341 GW
  • 2020354 GW
  • 2021512 GW
  • 2022649 GW
  • 2023800 GW
  • 2024530 GW
  • 2025541 GW

Bar length is capacity requested that year; the colours split it into capacity that reached operation, withdrew, or is still in the queue.

Breakdown

GroupRequestsCapacityReached operationWithdrewOutcome
West (non-ISO)7,9811,406 GW4.5%62.9%
MISO5,3891,037 GW6.8%59.5%
PJM7,497812 GW10.3%72.4%
ERCOT3,603792 GW11.9%32.0%
CAISO2,866719 GW4.5%77.8%
Southeast (non-ISO)3,892689 GW8.2%69.0%
SPP2,811577 GW7.7%65.9%
NYISO1,898359 GW5.2%87.2%
ISO-NE1,280149 GW11.1%79.1%

Shares are of requested capacity inside the current filter. A narrow filter can rest on very few requests, so read the request count beside each share.

Method and limits

Each request is counted once, at the capacity and status the dataset records for it, and grouped by the year it was filed. Requests missing a region, resource type, filing year or capacity are left out: 692 of 38,201 requests. Recent filing years are unsettled, since requests filed in the last few years may still be built or withdrawn.

Because of that filter, the shares here differ from the ones on the statistics page, which republishes Berkeley Lab's own summary tables over every status they report. Neither is more correct: this page counts the individual requests, that page carries the published tables. For PJM, for example, this page reads 10.3% of requested capacity as having reached operation where the published table reads 13.3%.

The dataset records outcomes and dates, not reasons. Nothing here says why a request withdrew, and a share computed over a handful of requests is a reading of those requests, not a rate to plan against. For the published tables and the time-to-build figures, see queue statistics; for cost figures, see interconnection costs.

Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition, data file through 2025, CC BY 4.0. Computed September 18, 2026.

Have a controlled site and a next gate?

GridVision qualifies a limited number of Northern Virginia data-center sites for a Site Evidence Record and 90-Day Gate Closure Plan. The public form collects contact details only.

Request a qualification conversation

Do not send site records, confidential information, or transaction documents through the public form.