Qualification conversation
Start with contact information—not site documents.
The first conversation determines whether the current Northern Virginia offer fits the buyer, site state and next milestone. This form intentionally does not collect parcel, load, utility, land-use or transaction details.
Prefer email? Contact hello@gridvisionai.com without attaching project materials.
Submitting a request is not an engagement or site analysis. A bounded qualification conversation is scheduled only after the limited entity, E&O, counsel-notice, conflict and secure-workspace controls pass. No proposal, signature or payment is accepted until the full commercial gate passes. Controlled production intake and Identity Lock additionally require a signed SOW and settled payment. SER/Plan evidence assembly and Baseline production, Authority outreach, and R1 artifact work begin only after Day 0 is confirmed in writing.
Discussed during qualification
A qualified opportunity meets all six conditions.
- Controlled site
- You control a real site. This condition remains unconfirmed until counsel verifies control in writing through the approved qualification path or an eligible executed instrument is received through the approved secure process.
- Defined identity
- The boundary, parcels, project entity, load scenario and primary utility path are sufficiently defined.
- Named milestone
- A milestone exists within 120 days, with a target date, owner and accepting party.
- Cross-workstream dependency
- A specific power artifact and land-use or site artifact are dependent, inconsistent or likely to cause rework.
- Economic buyer
- A named buyer controls the engagement and the next development spend.
- Commercial fit
- The buyer is willing to evaluate the fixed-scope, 100%-prepaid Founding Baseline.
Not the current offer
Some needs should be disqualified quickly.
- Choosing among multiple uncontrolled sites
- A national map or speculative capacity scan
- No named milestone within 120 days or no economic buyer
- A request for legal advice, engineering study, utility commitment, permit outcome, brokerage or lobbying
- Named third-party reliance
- Payment tied to an authority, utility or transaction outcome
