Queue Explorer
Search represented projects and locations across the national interface and open a project detail page.
Covers represented sources only; coverage is not universal across ISO/RTO markets.
PJM interconnection decision sprint
One project. One POI. One cited go / review / stop memo in 10 business days.
GridVision organizes the project, queue, site, and authorized network evidence behind one live management decision. Missing evidence stays visible; formal PJM and engineering studies remain authoritative.
Compare two cost-document versions · $2,500–$3,500 →The executive problem
Queue, market, site, and project evidence arrive fragmented and in different states of certainty. Management still has to commit the next study dollar. GridVision turns that evidence into a decision-ready recommendation with its basis attached.
Today that evidence sits in
Point of view
A decision system, not a data aggregator. The queue is not merely a filing problem—it is a capital-allocation problem, and every position must keep earning its next commitment.
Market reality
Published industry research, not GridVision results. These figures describe the market developers are deciding in.
13%
of capacity that requested interconnection between 2000 and 2020 had reached commercial operation by the end of 2025
75%
of that same capacity was withdrawn from the queue
~2,060 GW
of generation and storage was still actively seeking interconnection at the end of 2025
5+ years
median time from interconnection request to commercial operation, for projects built in 2025
Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition. Data as of year-end 2025; published June 2026.
Six ISO markets represented
PJM, MISO, CAISO, NYISO, ISO-NE, SPP. Represented sources — coverage is not universal across ISO/RTO markets.
Read the public record for eachThree evidence-gated verdicts
PURSUE, REVIEW, DEPRIORITIZE express relative development priority, not an investment decision.
N/A rather than a guess
A missing source field is shown as N/A and never replaced with sample or inferred data.
How GridVision works
Define the project, market, POI, decision owner, and evidence cut-off in a structured intake. No input is guessed.
Bind the analysis to authorized project, queue, and network evidence. Gaps are recorded rather than filled.
Run deterministic DC screening when an authorized current network model and required ratings are available.
Apply the evidence gate. Where required evidence is absent, the policy forces review rather than ranking.
Persist an append-only Decision Record with verdict, evidence coverage, risks, unknowns, and next diligence.
GridVision owns the deliverable. Management review and formal utility and engineering studies remain authoritative throughout.
Product capabilities
Each capability carries its own state and scope. Nothing on this page is described as live unless it is.
Search represented projects and locations across the national interface and open a project detail page.
Covers represented sources only; coverage is not universal across ISO/RTO markets.
Define a project or comparison in a structured intake across supported market and project fields.
No field is inferred. Unsupplied inputs remain unsupplied.
Use a verified current queue record when a supported provider returns one for the project in question.
If the record is unavailable, the analysis does not fall back to sample evidence.
Deterministic DC screening over an authorized current network model with the required ratings and injections.
Not an AC, stability, short-circuit, protection, or utility study. Unavailable without an authorized snapshot.
Screening support within the same deterministic DC scope as the rest of the network analysis.
Scope is limited to the authorized network model supplied; it is not a utility hosting-capacity publication.
Retain source, as-of time, fetch time, dataset and model versions, hashes, freshness, and transformation notes where present.
A lineage reference records provenance. It is not independent verification of the source.
Persist an append-only, tenant-scoped record of the analysis that authorized users can reopen later.
A new analysis creates a new record. Existing records are never rewritten.
Export an evidence-backed JSON or PDF report of the Decision Record for a management meeting.
Available to roles holding export permission. Export is audit logged.
Compare options manually with explicit input references and visible source limitations.
Sample or unknown queue evidence is not decision-eligible in a comparison.
Capture decision owner, reviewer, comments, and approval as append-only review events.
The recorded management decision remains the customer's judgment; the system only records the review.
A decision-native register comparing forecast versions, assumptions, owners, conflicts, and decision impact.
Not shipped. Forecasts may be recorded as evidence inputs, but are not independently verified.
Following a formal Decision Record through to its later real-world result as one chain.
Not shipped. Do not rely on closed-loop outcome tracking.
Public-data demonstration
Beacon Solar · AG1-553 · Cordova 345 kV
Public sources · October 7, 2026Review disposition
REVIEW
Decision basis
The project fact sheet targets Q4 2028. PJM displays January 15, 2030. The reason for that difference remains unknown.
Management action
Authenticate the current obligations and reconcile the schedule before relying on this public record.
Study basis
Phase III v1.00, September 18, 2025. Historical study estimates are kept separate from security and cash paid.
Decisive diligence
Confirm the latest agreement, cost exhibits, security ledger and approved project schedule.
Evidence trail
The five-page record links to official PJM and developer sources, with document versions and retrieval dates.
Evidence coverage
Public study, project status, facilities report and project fact sheet. No confidential inputs were supplied.
Unknowns
Current obligations, payments, authorized decision owner and a reconciled schedule remain unverified.
Public-data demonstration, not a customer case or commissioned engagement. REVIEW is a document-verification gate, not an engineering go/no-go verdict. The developer has not endorsed this record.
Public-record retrospectives
Readings of a public dataset, not customer case studies. Every row can be checked against the source.
PJM
Hatfield 500 kV
3 built · 3 withdrawn
PJM
Essex 230 kV
3 built · 5 withdrawn
PJM
Axton 138 kV
1 built · 4 withdrawn
PJM
Dickerson 230 kV
2 built · 4 withdrawn
Trust and evidence
Decision evidence across six major ISO markets—PJM, MISO, CAISO, NYISO, ISO-NE, and SPP—organized for management review. Represented project records carry source attribution, and absent source fields are shown as N/A rather than filled with invented values.
PJM Decision Sprint
GridVision organizes the evidence behind one project and one POI before your team commits the next study or development dollar. Bring a decision due within 90 days; we return a cited GO / REVIEW / STOP Decision Record in ten business days when the required evidence is available.
This is a scoped decision-support engagement, not a utility or engineering study, investment advice, or guarantee of cost, capacity, or schedule. Founder-approved commercial terms are confirmed after the eligibility review. We reply to a submitted request within one business day.
Initial scoped sprints: USD $7,500–$15,000. Final scope and fee are agreed in a written quote. The ten-business-day clock begins when the agreed evidence packet and payment terms are satisfied.
Decisions in scope
What the project team provides
Deliverables
Evidence and source-date map
Facts, assumptions and unknowns register
POI and queue risk review
Evidence-gap and next-diligence plan
GO / REVIEW / STOP Decision Record
One management review meeting
Where required evidence is missing, GridVision identifies the gap rather than substituting for it — an evidence-gap assessment remains a valid outcome, but an unsupported model-based conclusion is not issued. Success does not require a predetermined recommendation, model result, or commercial outcome. Formal utility determinations and engineering studies remain authoritative, and final judgment and action remain with the customer's management.
Next step
Bring the project, POI, decision deadline, and evidence owner. We will first check whether the decision fits the current PJM evidence and delivery scope.
The first review is a 15-minute eligibility call. Scope is then agreed around one project, one POI, one decision, and the sources you are authorized to use.