Earlier work (2025–2026). GridVision now focuses on data-center site advancement and cross-gate coordination for controlled sites in Northern Virginia. The interconnection-queue research below is kept for reference and retains the vocabulary of the period in which it was written; it is not a current product.

Interconnection queue data

Colorado interconnection queue

594 interconnection requests have been filed at points of interconnection in Colorado since 2003, totalling 119 GW. Of that capacity, 1.5% reached commercial operation and 63.3% withdrew.

GridVision AI ResearchPublished Updated

Headline figures

119 GW
of capacity requested in Colorado since 2003
1.5%
of it reached commercial operation; 63.3% withdrew
56 GW
filed in the last six years (275 requests), of which 59.3% is still in the queue

Which markets Colorado requests sit in

A state is a location, not a market. Requests at Colorado points of interconnection are studied by the market that runs the queue there, and the process differs between them.

MarketRequestsCapacity filedReached operationWithdrewOutcome by capacity
West587116 GW1.5%62.6%
SPP72 GW0.0%100.0%

Process pages: SPP.

By resource type

ResourceRequestsCapacity filedReached operationWithdrewOutcome by capacity
Solar20228 GW1.0%73.2%
Wind16644 GW2.3%70.0%
Hybrid12328 GW0.0%47.9%
Battery557 GW0.0%49.5%
Gas367 GW6.0%48.7%
Other124 GW0.0%78.5%

Hybrid covers requests the dataset records as a combination, such as solar plus battery.

By year filed

  • 20032 GW
  • 20043 GW
  • 2005279 MW
  • 20063 GW
  • 20074 GW
  • 200810 GW
  • 20092 GW
  • 20103 GW
  • 20111 GW
  • 2012576 MW
  • 2013990 MW
  • 20142 GW
  • 2015807 MW
  • 20166 GW
  • 201714 GW
  • 20187 GW
  • 20193 GW
  • 20205 GW
  • 20219 GW
  • 20227 GW
  • 20238 GW
  • 202414 GW
  • 202512 GW

Recent years are unsettled: requests filed in the last few years may still be built or withdrawn.

Points of interconnection with the most requests

  • Rawhide 230kV20 requests in the dataset
  • Missile Site Substation17 requests in the dataset
  • Pawnee Substation16 requests in the dataset
  • San Luis Substation14 requests in the dataset
  • Lamar Substation13 requests in the dataset
  • Comanche Substation11 requests in the dataset

Names are as the dataset records them, so spelling variants of one station can appear separately.

Method and limits

Each request is counted once, at the capacity and status the dataset records for it, and placed in the state the dataset gives for its point of interconnection. Requests missing a state, status, filing year or capacity are left out. The dataset records outcomes and dates, not reasons, so nothing here says why a request withdrew, and no share is a rate to plan against.

For the same record filtered your own way, use the queue explorer; for national tables and time-to-build figures, see queue statistics.

Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition, data file through 2025, CC BY 4.0. Computed September 18, 2026.

Have a controlled site and a next gate?

GridVision qualifies a limited number of Northern Virginia data-center sites for a Site Evidence Record and 90-Day Gate Closure Plan. The public form collects contact details only.

Request a qualification conversation

Do not send site records, confidential information, or transaction documents through the public form.