Earlier work (2025–2026). GridVision now focuses on data-center site advancement and cross-gate coordination for controlled sites in Northern Virginia. The interconnection-queue research below is kept for reference and retains the vocabulary of the period in which it was written; it is not a current product.

Interconnection queue data

Missouri interconnection queue

399 interconnection requests have been filed at points of interconnection in Missouri since 2001, totalling 85 GW. Of that capacity, 4.9% reached commercial operation and 60.3% withdrew.

GridVision AI ResearchPublished Updated

Headline figures

85 GW
of capacity requested in Missouri since 2001
4.9%
of it reached commercial operation; 60.3% withdrew
43 GW
filed in the last six years (207 requests), of which 52.5% is still in the queue

Which markets Missouri requests sit in

A state is a location, not a market. Requests at Missouri points of interconnection are studied by the market that runs the queue there, and the process differs between them.

MarketRequestsCapacity filedReached operationWithdrewOutcome by capacity
SPP17435 GW7.2%67.7%
MISO15434 GW4.6%52.4%
Southeast7115 GW0.0%60.7%

Process pages: SPP, MISO.

By resource type

ResourceRequestsCapacity filedReached operationWithdrewOutcome by capacity
Solar15027 GW2.2%68.2%
Wind9321 GW9.7%73.7%
Battery6810 GW0.0%44.0%
Gas3712 GW1.6%37.7%
Other289 GW14.4%66.9%
Hybrid236 GW0.0%42.0%

Hybrid covers requests the dataset records as a combination, such as solar plus battery.

By year filed

  • 20013 GW
  • 20032 GW
  • 20042 GW
  • 2005315 MW
  • 20061 GW
  • 20073 GW
  • 2008636 MW
  • 20091 GW
  • 20101 GW
  • 2011819 MW
  • 201233 MW
  • 2013428 MW
  • 2014801 MW
  • 2015646 MW
  • 20163 GW
  • 20173 GW
  • 201812 GW
  • 20196 GW
  • 20203 GW
  • 20212 GW
  • 20229 GW
  • 20238 GW
  • 202410 GW
  • 202513 GW

Recent years are unsettled: requests filed in the last few years may still be built or withdrawn.

Points of interconnection with the most requests

  • McCredie 345 kV5 requests in the dataset
  • LaRussell Energy Center 161kV5 requests in the dataset
  • Spencer Creek 345 kV Substation4 requests in the dataset
  • Mullin Creek 345 kV Substation4 requests in the dataset
  • Gobbler Knob 345 kV Bus3 requests in the dataset
  • New Madrid to Dell 500 kV3 requests in the dataset

Names are as the dataset records them, so spelling variants of one station can appear separately.

Method and limits

Each request is counted once, at the capacity and status the dataset records for it, and placed in the state the dataset gives for its point of interconnection. Requests missing a state, status, filing year or capacity are left out. The dataset records outcomes and dates, not reasons, so nothing here says why a request withdrew, and no share is a rate to plan against.

For the same record filtered your own way, use the queue explorer; for national tables and time-to-build figures, see queue statistics.

Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition, data file through 2025, CC BY 4.0. Computed September 18, 2026.

Have a controlled site and a next gate?

GridVision qualifies a limited number of Northern Virginia data-center sites for a Site Evidence Record and 90-Day Gate Closure Plan. The public form collects contact details only.

Request a qualification conversation

Do not send site records, confidential information, or transaction documents through the public form.