Interconnection queue data
New Jersey interconnection queue
1,195 interconnection requests have been filed at points of interconnection in New Jersey since 2000, totalling 118 GW. Of that capacity, 8.6% reached commercial operation and 77.9% withdrew.
GridVision AI ResearchPublished Updated
Headline figures
- 118 GW
- of capacity requested in New Jersey since 2000
- 8.6%
- of it reached commercial operation; 77.9% withdrew
- 31 GW
- filed in the last six years (157 requests), of which 44.8% is still in the queue
Which markets New Jersey requests sit in
A state is a location, not a market. Requests at New Jersey points of interconnection are studied by the market that runs the queue there, and the process differs between them.
| Market | Requests | Capacity filed | Reached operation | Withdrew | Outcome by capacity |
|---|---|---|---|---|---|
| PJM | 1,183 | 114 GW | 8.4% | 77.6% | |
| NYISO | 12 | 4 GW | 14.2% | 85.8% |
By resource type
| Resource | Requests | Capacity filed | Reached operation | Withdrew | Outcome by capacity |
|---|---|---|---|---|---|
| Solar | 666 | 7 GW | 11.5% | 77.0% | |
| Gas | 254 | 62 GW | 13.0% | 86.3% | |
| Battery | 125 | 10 GW | 1.3% | 61.2% | |
| Other | 56 | 3 GW | 16.1% | 75.9% | |
| Wind | 52 | 35 GW | 0.0% | 68.8% | |
| Hybrid | 42 | 2 GW | 35.1% | 58.9% |
Hybrid covers requests the dataset records as a combination, such as solar plus battery.
By year filed
- 20005 GW
- 20014 GW
- 2002751 MW
- 200323 MW
- 2004400 MW
- 20052 GW
- 20064 GW
- 20076 GW
- 20088 GW
- 2009586 MW
- 20107 GW
- 20114 GW
- 20124 GW
- 20132 GW
- 20142 GW
- 20157 GW
- 20162 GW
- 2017202 MW
- 20189 GW
- 20196 GW
- 20204 GW
- 20214 GW
- 202215 GW
- 20235 GW
- 20242 GW
- 20252 GW
Recent years are unsettled: requests filed in the last few years may still be built or withdrawn.
Points of interconnection with the most requests
- Essex 230kV8 requests in the dataset
- Hudson 230kV7 requests in the dataset
- Burlington 26kV7 requests in the dataset
- Linden 230kV7 requests in the dataset
- Lumberton 69kV7 requests in the dataset
- Linden6 requests in the dataset
Names are as the dataset records them, so spelling variants of one station can appear separately.
Published retrospectives in New Jersey
Method and limits
Each request is counted once, at the capacity and status the dataset records for it, and placed in the state the dataset gives for its point of interconnection. Requests missing a state, status, filing year or capacity are left out. The dataset records outcomes and dates, not reasons, so nothing here says why a request withdrew, and no share is a rate to plan against.
For the same record filtered your own way, use the queue explorer; for national tables and time-to-build figures, see queue statistics.
Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition, data file through 2025, CC BY 4.0. Computed September 18, 2026.
Have a controlled site and a next gate?