Earlier work (2025–2026). GridVision now focuses on data-center site advancement and cross-gate coordination for controlled sites in Northern Virginia. The interconnection-queue research below is kept for reference and retains the vocabulary of the period in which it was written; it is not a current product.

Interconnection queue data

Wyoming interconnection queue

400 interconnection requests have been filed at points of interconnection in Wyoming since 2001, totalling 86 GW. Of that capacity, 6.0% reached commercial operation and 72.4% withdrew.

GridVision AI ResearchPublished Updated

Headline figures

86 GW
of capacity requested in Wyoming since 2001
6.0%
of it reached commercial operation; 72.4% withdrew
42 GW
filed in the last six years (164 requests), of which 41.9% is still in the queue

Which markets Wyoming requests sit in

A state is a location, not a market. Requests at Wyoming points of interconnection are studied by the market that runs the queue there, and the process differs between them.

MarketRequestsCapacity filedReached operationWithdrewOutcome by capacity
West39581 GW6.3%70.8%
SPP3453 MW0.0%100.0%
CAISO13 GW0.0%100.0%
MISO11 GW0.0%100.0%

Process pages: SPP, CAISO, MISO.

By resource type

ResourceRequestsCapacity filedReached operationWithdrewOutcome by capacity
Wind21048 GW9.0%79.7%
Hybrid7416 GW0.0%56.4%
Solar405 GW6.4%58.8%
Gas295 GW8.6%36.9%
Battery289 GW0.0%89.6%
Other193 GW2.9%65.7%

Hybrid covers requests the dataset records as a combination, such as solar plus battery.

By year filed

  • 2001317 MW
  • 20021 GW
  • 2003931 MW
  • 2004585 MW
  • 2005790 MW
  • 2006383 MW
  • 20077 GW
  • 20085 GW
  • 20093 GW
  • 2010240 MW
  • 20114 GW
  • 2012716 MW
  • 2013339 MW
  • 20152 GW
  • 20162 GW
  • 20178 GW
  • 20182 GW
  • 20196 GW
  • 2020789 MW
  • 20216 GW
  • 202214 GW
  • 202310 GW
  • 20245 GW
  • 20257 GW

Recent years are unsettled: requests filed in the last few years may still be built or withdrawn.

Points of interconnection with the most requests

  • Aeolus substation33 requests in the dataset
  • Foote Creek substation19 requests in the dataset
  • Shirley Basin substation14 requests in the dataset
  • Windstar substation13 requests in the dataset
  • Anticline substation13 requests in the dataset
  • Freezeout substation8 requests in the dataset

Names are as the dataset records them, so spelling variants of one station can appear separately.

Method and limits

Each request is counted once, at the capacity and status the dataset records for it, and placed in the state the dataset gives for its point of interconnection. Requests missing a state, status, filing year or capacity are left out. The dataset records outcomes and dates, not reasons, so nothing here says why a request withdrew, and no share is a rate to plan against.

For the same record filtered your own way, use the queue explorer; for national tables and time-to-build figures, see queue statistics.

Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition, data file through 2025, CC BY 4.0. Computed September 18, 2026.

Have a controlled site and a next gate?

GridVision qualifies a limited number of Northern Virginia data-center sites for a Site Evidence Record and 90-Day Gate Closure Plan. The public form collects contact details only.

Request a qualification conversation

Do not send site records, confidential information, or transaction documents through the public form.