Earlier work (2025–2026). GridVision now focuses on data-center site advancement and cross-gate coordination for controlled sites in Northern Virginia. The interconnection-queue research below is kept for reference and retains the vocabulary of the period in which it was written; it is not a current product.

Interconnection queue data

Louisiana interconnection queue

466 interconnection requests have been filed at points of interconnection in Louisiana since 2001, totalling 101 GW. Of that capacity, 3.7% reached commercial operation and 59.1% withdrew.

GridVision AI ResearchPublished Updated

Headline figures

101 GW
of capacity requested in Louisiana since 2001
3.7%
of it reached commercial operation; 59.1% withdrew
79 GW
filed in the last six years (340 requests), of which 43.4% is still in the queue

Which markets Louisiana requests sit in

A state is a location, not a market. Requests at Louisiana points of interconnection are studied by the market that runs the queue there, and the process differs between them.

MarketRequestsCapacity filedReached operationWithdrewOutcome by capacity
MISO43692 GW3.4%58.3%
SPP309 GW6.7%66.9%

Process pages: MISO, SPP.

By resource type

ResourceRequestsCapacity filedReached operationWithdrewOutcome by capacity
Solar27042 GW2.0%64.9%
Battery709 GW0.0%66.8%
Hybrid5811 GW0.0%54.2%
Gas4937 GW7.9%51.7%
Other10466 MW0.0%55.6%
Wind92 GW0.0%66.0%

Hybrid covers requests the dataset records as a combination, such as solar plus battery.

By year filed

  • 20013 GW
  • 20061 GW
  • 200830 MW
  • 201111 MW
  • 201315 MW
  • 20145 GW
  • 20152 GW
  • 20162 GW
  • 20171 GW
  • 20182 GW
  • 20195 GW
  • 20205 GW
  • 20217 GW
  • 202224 GW
  • 20231 GW
  • 202414 GW
  • 202528 GW

Recent years are unsettled: requests filed in the last few years may still be built or withdrawn.

Points of interconnection with the most requests

  • BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kV5 requests in the dataset
  • NELSON 500 SWYD - RICHARD 500.0kV5 requests in the dataset
  • Waterford 230kV3 requests in the dataset
  • HARTBURG - AEP LAYFIELD 500.0kV3 requests in the dataset
  • DUNN - OAK RIDGE (LA) 115.0kV3 requests in the dataset
  • MCKNIGHT - PLANT DANIEL 500.0kV3 requests in the dataset

Names are as the dataset records them, so spelling variants of one station can appear separately.

Method and limits

Each request is counted once, at the capacity and status the dataset records for it, and placed in the state the dataset gives for its point of interconnection. Requests missing a state, status, filing year or capacity are left out. The dataset records outcomes and dates, not reasons, so nothing here says why a request withdrew, and no share is a rate to plan against.

For the same record filtered your own way, use the queue explorer; for national tables and time-to-build figures, see queue statistics.

Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition, data file through 2025, CC BY 4.0. Computed September 18, 2026.

Have a controlled site and a next gate?

GridVision qualifies a limited number of Northern Virginia data-center sites for a Site Evidence Record and 90-Day Gate Closure Plan. The public form collects contact details only.

Request a qualification conversation

Do not send site records, confidential information, or transaction documents through the public form.