North Carolina interconnection queue
602 interconnection requests have been filed at points of interconnection in North Carolina since 2000, totalling 78 GW. Of that capacity, 3.7% reached commercial operation and 69.6% withdrew.
GridVision AI ResearchPublished Updated
Headline figures
- 78 GW
- of capacity requested in North Carolina since 2000
- 3.7%
- of it reached commercial operation; 69.6% withdrew
- 42 GW
- filed in the last six years (373 requests), of which 45.9% is still in the queue
Which markets North Carolina requests sit in
A state is a location, not a market. Requests at North Carolina points of interconnection are studied by the market that runs the queue there, and the process differs between them.
| Market | Requests | Capacity filed | Reached operation | Withdrew | Outcome by capacity |
|---|---|---|---|---|---|
| Southeast | 410 | 63 GW | 1.6% | 68.6% | |
| PJM | 191 | 15 GW | 12.6% | 75.0% | |
| West | 1 | 275 MW | 0.0% | 0.0% |
Process pages: PJM.
By resource type
| Resource | Requests | Capacity filed | Reached operation | Withdrew | Outcome by capacity |
|---|---|---|---|---|---|
| Solar | 360 | 27 GW | 5.8% | 80.0% | |
| Gas | 92 | 35 GW | 2.3% | 70.3% | |
| Battery | 64 | 6 GW | 0.2% | 34.3% | |
| Other | 51 | 5 GW | 2.2% | 43.9% | |
| Hybrid | 20 | 2 GW | 0.0% | 77.7% | |
| Wind | 15 | 2 GW | 16.5% | 83.5% |
Hybrid covers requests the dataset records as a combination, such as solar plus battery.
By year filed
- 20003 MW
- 200662 MW
- 200712 MW
- 200880 MW
- 20101 GW
- 201120 MW
- 20123 GW
- 2013360 MW
- 20141 GW
- 20153 GW
- 20164 GW
- 20175 GW
- 20183 GW
- 201914 GW
- 20208 GW
- 20213 GW
- 20226 GW
- 20236 GW
- 20248 GW
- 202512 GW
Recent years are unsettled: requests filed in the last few years may still be built or withdrawn.
Points of interconnection with the most requests
- Cashie 230 kV9 requests in the dataset
- LEE SUB - WOMMACK 230KV SOUTH6 requests in the dataset
- Ernest SW Station 230 kV5 requests in the dataset
- LEE SUB - WOMMACK 230KV NORTH5 requests in the dataset
- Richmond 230 kV5 requests in the dataset
- Wayne County Plant Substation 230kV5 requests in the dataset
Names are as the dataset records them, so spelling variants of one station can appear separately.
Published retrospectives in North Carolina
Method and limits
Each request is counted once, at the capacity and status the dataset records for it, and placed in the state the dataset gives for its point of interconnection. Requests missing a state, status, filing year or capacity are left out. The dataset records outcomes and dates, not reasons, so nothing here says why a request withdrew, and no share is a rate to plan against.
For the same record filtered your own way, use the queue explorer; for national tables and time-to-build figures, see queue statistics.
Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition, data file through 2025, CC BY 4.0. Computed September 18, 2026.
Want this reading for a North Carolina point of interconnection?
Send the node and the market. We read the public queue record for it — what was filed, what was built, what withdrew and how long each took — and send back what the record does and does not show.
Ask for a node retrospectivePublic-record reading only. Management review and formal interconnection studies remain authoritative.