Nine interconnection requests since 2017: 7 withdrew and 2 remain active.

Built
0
Withdrawn
7
Still in queue
2

The queue record

Every interconnection request the dataset records at this point of interconnection, in filing order.

Interconnection requests recorded at this point of interconnection, with request date, capacity and outcome.
RequestedProjectTechnologyCapacityOutcome
2017-09-29(unnamed)Solar150 MWWithdrawn2017-10-02
2018-03-29(unnamed)Solar + battery80 MWWithdrawn2018-04-03
2018-03-29(unnamed)Solar + battery80 MWWithdrawn2018-04-03
2018-03-29(unnamed)Solar + battery80 MWWithdrawn2018-04-03
2018-05-25(unnamed)Solar + battery80 MWWithdrawn2020-10-03
2018-05-25(unnamed)Solar + battery80 MWWithdrawn2020-10-03
2018-05-25(unnamed)Solar + battery80 MWWithdrawn2020-10-03
2025-02-07(unnamed)Solar40 MWStill in queue
2025-02-07(unnamed)Solar70 MWStill in queue

What the record shows

  • 630 MW of the 740 MW filed here withdrew.
  • The largest request filed here, 150 MW (solar), withdrew 0.0 years after filing.
  • Three requests were filed on 2018-05-25; all of them withdrew.
  • Four of the 7 withdrawals came within a year of filing.
  • By technology, the requests here were solar + battery 6, solar 3.
  • The longest-standing active request here was filed on 2025-02-07.

What a decision record would have to make explicit

  • None of the resolved requests at this node reached operation, and the public record does not say why.
  • Two requests are unresolved, so the outcome counts at this node can still change.
  • The dataset records outcomes and dates, not reasons, so no cause is attributed to any outcome here.

What this does and does not show

This is a reading of a public dataset, not a customer case study: no engagement, customer or client is involved. The dataset records outcomes — what was built, what withdrew, and when — but not why any project withdrew, so no cause is attributed here. Nothing on this page claims GridVision predicted, influenced or would have changed any outcome, and a pattern at one point of interconnection does not generalise to another.

Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition — project-level interconnection queue dataset. Interconnection requests through year-end 2025. Used under CC BY 4.0; attribution to Lawrence Berkeley National Laboratory and GridTracker.