Earlier work (2025–2026). GridVision now focuses on data-center site advancement and cross-gate coordination for controlled sites in Northern Virginia. The interconnection-queue research below is kept for reference and retains the vocabulary of the period in which it was written; it is not a current product.

Interconnection queue data

South Dakota interconnection queue

355 interconnection requests have been filed at points of interconnection in South Dakota since 2000, totalling 75 GW. Of that capacity, 6.2% reached commercial operation and 80.9% withdrew.

GridVision AI ResearchPublished Updated

Headline figures

75 GW
of capacity requested in South Dakota since 2000
6.2%
of it reached commercial operation; 80.9% withdrew
17 GW
filed in the last six years (82 requests), of which 38.3% is still in the queue

Which markets South Dakota requests sit in

A state is a location, not a market. Requests at South Dakota points of interconnection are studied by the market that runs the queue there, and the process differs between them.

MarketRequestsCapacity filedReached operationWithdrewOutcome by capacity
West16127 GW6.3%82.0%
MISO12130 GW6.1%77.9%
SPP7012 GW8.7%78.0%
PJM35 GW0.0%100.0%

Process pages: MISO, SPP, PJM.

By resource type

ResourceRequestsCapacity filedReached operationWithdrewOutcome by capacity
Wind23052 GW6.0%88.5%
Other388 GW0.8%82.5%
Solar345 GW4.2%55.0%
Gas305 GW26.4%37.0%
Battery122 GW0.0%67.8%
Hybrid112 GW0.0%52.4%

Hybrid covers requests the dataset records as a combination, such as solar plus battery.

By year filed

  • 2000407 MW
  • 20014 GW
  • 2002483 MW
  • 20033 GW
  • 20042 GW
  • 20052 GW
  • 200612 GW
  • 200711 GW
  • 20083 GW
  • 20092 GW
  • 20102 GW
  • 20112 GW
  • 2012648 MW
  • 2013691 MW
  • 2014500 MW
  • 20153 GW
  • 20165 GW
  • 20174 GW
  • 2018853 MW
  • 20191 GW
  • 20201 GW
  • 2021802 MW
  • 20224 GW
  • 20233 GW
  • 20243 GW
  • 20255 GW

Recent years are unsettled: requests filed in the last few years may still be built or withdrawn.

Points of interconnection with the most requests

  • Groton 115kV9 requests in the dataset
  • Watertown8 requests in the dataset
  • Hughes 230 kV5 requests in the dataset
  • Ellendale 345 - Twin Brooks 345.0kV4 requests in the dataset
  • Big Stone South 345 kV substation4 requests in the dataset
  • Chappelle Creek 345 kV4 requests in the dataset

Names are as the dataset records them, so spelling variants of one station can appear separately.

Published retrospectives in South Dakota

Method and limits

Each request is counted once, at the capacity and status the dataset records for it, and placed in the state the dataset gives for its point of interconnection. Requests missing a state, status, filing year or capacity are left out. The dataset records outcomes and dates, not reasons, so nothing here says why a request withdrew, and no share is a rate to plan against.

For the same record filtered your own way, use the queue explorer; for national tables and time-to-build figures, see queue statistics.

Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition, data file through 2025, CC BY 4.0. Computed September 18, 2026.

Have a controlled site and a next gate?

GridVision qualifies a limited number of Northern Virginia data-center sites for a Site Evidence Record and 90-Day Gate Closure Plan. The public form collects contact details only.

Request a qualification conversation

Do not send site records, confidential information, or transaction documents through the public form.