Interconnection queue data
Arkansas interconnection queue
493 interconnection requests have been filed at points of interconnection in Arkansas since 2000, totalling 96 GW. Of that capacity, 3.9% reached commercial operation and 59.2% withdrew.
GridVision AI ResearchPublished Updated
Headline figures
- 96 GW
- of capacity requested in Arkansas since 2000
- 3.9%
- of it reached commercial operation; 59.2% withdrew
- 78 GW
- filed in the last six years (376 requests), of which 42.1% is still in the queue
Which markets Arkansas requests sit in
A state is a location, not a market. Requests at Arkansas points of interconnection are studied by the market that runs the queue there, and the process differs between them.
| Market | Requests | Capacity filed | Reached operation | Withdrew | Outcome by capacity |
|---|---|---|---|---|---|
| MISO | 433 | 83 GW | 2.9% | 57.1% | |
| SPP | 54 | 10 GW | 13.4% | 64.8% | |
| Southeast | 6 | 3 GW | 0.0% | 100.0% |
By resource type
| Resource | Requests | Capacity filed | Reached operation | Withdrew | Outcome by capacity |
|---|---|---|---|---|---|
| Solar | 308 | 59 GW | 1.4% | 62.3% | |
| Hybrid | 76 | 16 GW | 0.5% | 48.9% | |
| Battery | 68 | 9 GW | 0.0% | 76.8% | |
| Wind | 21 | 4 GW | 0.0% | 34.0% | |
| Gas | 13 | 7 GW | 30.9% | 45.7% | |
| Other | 7 | 2 GW | 32.1% | 66.9% |
Hybrid covers requests the dataset records as a combination, such as solar plus battery.
By year filed
- 2000660 MW
- 2001630 MW
- 20062 GW
- 2008150 MW
- 200960 MW
- 201020 MW
- 2013530 MW
- 20142 GW
- 20151 GW
- 20162 GW
- 20172 GW
- 20183 GW
- 20193 GW
- 20202 GW
- 202110 GW
- 202230 GW
- 20236 GW
- 202420 GW
- 202511 GW
Recent years are unsettled: requests filed in the last few years may still be built or withdrawn.
Points of interconnection with the most requests
- STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV10 requests in the dataset
- SHERIDAN EHV - EL DORADO EHV 500.0kV9 requests in the dataset
- WEST MEMPHIS EHV - KEO EHV 500.0kV7 requests in the dataset
- RITCHIE SWYD - TARLETON 230.0kV5 requests in the dataset
- El Dorado 500kV Substation4 requests in the dataset
- DELL EHV - SAN SOUCI 500.0kV4 requests in the dataset
Names are as the dataset records them, so spelling variants of one station can appear separately.
Published retrospectives in Arkansas
Method and limits
Each request is counted once, at the capacity and status the dataset records for it, and placed in the state the dataset gives for its point of interconnection. Requests missing a state, status, filing year or capacity are left out. The dataset records outcomes and dates, not reasons, so nothing here says why a request withdrew, and no share is a rate to plan against.
For the same record filtered your own way, use the queue explorer; for national tables and time-to-build figures, see queue statistics.
Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition, data file through 2025, CC BY 4.0. Computed September 18, 2026.
Have a controlled site and a next gate?
GridVision qualifies a limited number of Northern Virginia data-center sites for a Site Evidence Record and 90-Day Gate Closure Plan. The public form collects contact details only.
Request a qualification conversationDo not send site records, confidential information, or transaction documents through the public form.