PJM · Virginia
North Anna Unit 1 filed twice, and both were built.
North Anna 500 kV
Five interconnection requests since 2006: 4 reached commercial operation, 1 withdrew.
- Built
- 4
- Withdrawn
- 1
- Still in queue
- 0
The queue record
Every interconnection request the dataset records at this point of interconnection, in filing order.
| Requested | Project | Technology | Capacity | Outcome |
|---|---|---|---|---|
| 2006-07-14 | North Anna Power Station Unit 3 | Nuclear | 1594 MW | Withdrawn2016-04-28 |
| 2007-07-31 | North Anna Unit 1 | Nuclear | 20 MW | Built2010-05-18 · 2.8 yrs |
| 2007-07-31 | North Anna Unit 2 | Nuclear | 20 MW | Built2010-05-02 · 2.8 yrs |
| 2007-07-31 | North Anna Unit 1 | Nuclear | 65 MW | Built2010-05-02 · 2.8 yrs |
| 2007-07-31 | North Anna Unit 2 | Nuclear | 65 MW | Built2010-05-18 · 2.8 yrs |
What the record shows
- One of the five requests at this node withdrew, and 1,594 MW of the 1,764 MW filed here never reached operation.
- The 4 projects that were built each took about 2.8 years from request to commercial operation.
- The largest request ever filed here, 1594 MW, withdrew 9.8 years after filing.
- Four requests were filed on 2007-07-31, and all of them reached operation.
- North Anna Unit 1 appears two times in the queue at this node, all filed in 2007, of which two reached operation.
What a decision record would have to make explicit
- With five requests, nothing at this node generalises to another; it is a record, not a rate.
- The dataset records no withdrawal reasons, study costs or upgrade assignments, so those remain unknowns on this record.
What this does and does not show
This is a reading of a public dataset, not a customer case study: no engagement, customer or client is involved. The dataset records outcomes — what was built, what withdrew, and when — but not why any project withdrew, so no cause is attributed here. Nothing on this page claims GridVision predicted, influenced or would have changed any outcome, and a pattern at one point of interconnection does not generalise to another.
Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition — project-level interconnection queue dataset. Interconnection requests through year-end 2025. Used under CC BY 4.0; attribution to Lawrence Berkeley National Laboratory and GridTracker.