Skip to content
← All retrospectives

PJM · Virginia

Fort Powhatan Solar filed twice, and one of them was built.

Hopewell-Surry 230 kV

Five interconnection requests since 2015: 3 reached commercial operation, 2 withdrew.

Built
3
Withdrawn
2
Still in queue
0

The queue record

Every interconnection request the dataset records at this point of interconnection, in filing order.

Interconnection requests recorded at this point of interconnection, with request date, capacity and outcome.
RequestedProjectTechnologyCapacityOutcome
2015-04-30Fort Powhatan SolarSolar80 MWWithdrawn2017-10-13
2016-04-29Colonial Trail West SolarSolar142.4 MWBuilt2019-11-07 · 3.5 yrs
2016-04-29Fort Powhatan SolarSolar150 MWBuilt2022-01-19 · 5.7 yrs
2016-10-31Spring Grove I SolarSolar97.9 MWBuilt2020-10-01 · 3.9 yrs
2020-09-16(unnamed)Solar20 MWWithdrawn2025-03-28

What the record shows

  • Two of the five requests at this node withdrew, and 100 MW of the 490 MW filed here never reached operation.
  • Completions here took between 3.5 and 5.7 years from request to commercial operation.
  • The largest request filed here, 150 MW, is among those that reached operation.
  • Two requests were filed on 2016-04-29, and all of them reached operation.
  • Fort Powhatan Solar appears two times in the queue at this node, filed between 2015 and 2016, of which one reached operation.

What a decision record would have to make explicit

  • With five requests, nothing at this node generalises to another; it is a record, not a rate.
  • The dataset records no withdrawal reasons, study costs or upgrade assignments, so those remain unknowns on this record.

What this does and does not show

This is a reading of a public dataset, not a customer case study: no engagement, customer or client is involved. The dataset records outcomes — what was built, what withdrew, and when — but not why any project withdrew, so no cause is attributed here. Nothing on this page claims GridVision predicted, influenced or would have changed any outcome, and a pattern at one point of interconnection does not generalise to another.

Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition — project-level interconnection queue dataset. Interconnection requests through year-end 2025. Used under CC BY 4.0; attribution to Lawrence Berkeley National Laboratory and GridTracker.