Stroud switching station 70 kV: interconnection queue history
Five withdrawals, and one 20 MW project.
GridVision AI ResearchUpdated
Six interconnection requests since 2010: 1 reached commercial operation, 5 withdrew.
- Built
- 1
- Withdrawn
- 5
- Still in queue
- 0
The queue record
Every interconnection request the dataset records at this point of interconnection, in filing order.
| Requested | Project | Technology | Capacity | Outcome |
|---|---|---|---|---|
| 2010-06-01 | SUMMER WHEAT SOLAR FARM | Solar | 20 MW | Built2018-10-11 · 8.4 yrs |
| 2010-06-01 | SAN JOAQUIN 2A | Solar | 20 MW | Withdrawn2015-06-11 |
| 2011-03-31 | ELEVATION SOLAR C | Solar | 0.1 MW | Withdrawn2016-07-28 |
| 2011-03-31 | INSPIRATION SOLAR C | Solar | 0.1 MW | Withdrawn2016-07-28 |
| 2011-03-31 | INSPIRATION SOLAR E | Solar | 0.1 MW | Withdrawn2016-07-28 |
| 2011-03-31 | INSPIRATION SOLAR F | Solar | 0.1 MW | Withdrawn2016-07-28 |
What the record shows
- Five of the six requests at this node withdrew, and 20 MW of the 40 MW filed here never reached operation.
- The one project that reached operation, 20 MW of solar, took 8.4 years from request to commercial operation.
- The largest request filed here, 20 MW, is among those that reached operation.
- Four requests were filed on 2011-03-31, and all of them withdrew.
- No request at this node remains active, so its record is settled.
What a decision record would have to make explicit
- With six requests, nothing at this node generalises to another; it is a record, not a rate.
- The dataset records no withdrawal reasons, study costs or upgrade assignments, so those remain unknowns on this record.
What this does and does not show
This is a reading of a public dataset, not a customer case study: no engagement, customer or client is involved. The dataset records outcomes — what was built, what withdrew, and when — but not why any project withdrew, so no cause is attributed here. Nothing on this page claims GridVision predicted, influenced or would have changed any outcome, and a pattern at one point of interconnection does not generalise to another.
Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition — project-level interconnection queue dataset. Interconnection requests through year-end 2025. Used under CC BY 4.0; attribution to Lawrence Berkeley National Laboratory and GridTracker.
Related points of interconnection
- CAISO · CaliforniaColorado River Substation 230 kV16 requests · 3 built · 11 withdrawn · 2 still in queueRead the record
- CAISO · CaliforniaWindhub Substation 230 kV16 requests · 3 built · 8 withdrawn · 5 still in queueRead the record
- CAISO · CaliforniaWhirlwind Substation 230 kV23 requests · 6 built · 10 withdrawn · 7 still in queueRead the record
- CAISO · CaliforniaOtay Mesa Switchyard 230 kV14 requests · 6 built · 5 withdrawn · 3 still in queueRead the record
How the CAISO process works today: CAISO interconnection queue. The whole California queue record, by market, resource and year filed: California interconnection queue. Comparing candidate nodes for a project? Read how to choose a point of interconnection.