CAISO · California
1,598 MW filed. 169 MW built.
Kramer Substation 230 kV
Nine interconnection requests since 2008: 1 reached commercial operation, 3 withdrew, 5 remain active.
- Built
- 1
- Withdrawn
- 3
- Still in queue
- 5
The queue record
Every interconnection request the dataset records at this point of interconnection, in filing order.
| Requested | Project | Technology | Capacity | Outcome |
|---|---|---|---|---|
| 2008-05-29 | COSO #1 | Geothermal | 15 MW | Withdrawn2011-02-07 |
| 2013-04-30 | KRAMER SOLAR | Solar | 200 MW | Withdrawn2014-03-06 |
| 2013-04-30 | FREMONT VALLEY PRESERVATION | Solar | 245 MW | Withdrawn2014-04-17 |
| 2015-04-30 | ARATINA SOLAR CENTER 1 | Solar + battery | 200 MW | Still in queue |
| 2016-05-02 | DAGGETT SOLAR 2 | Solar + battery | 169 MW | Built2023-11-22 · 7.6 yrs |
| 2016-05-02 | DAGGETT SOLAR 3 | Solar + battery | 313.88 MW | Still in queue |
| 2019-04-15 | ARATINA SOLAR CENTER 2 | Solar + battery | 200 MW | Still in queue |
| 2019-04-15 | LOCKHART SOLAR 2 | Solar + battery | 105 MW | Still in queue |
| 2020-04-15 | OVERNIGHT SOLAR | Solar + battery | 150 MW | Still in queue |
What the record shows
- Three of the nine requests at this node withdrew, and 1,429 MW of the 1,598 MW filed here never reached operation.
- The one project that reached operation, 169 MW of solar + battery, took 7.6 years from request to commercial operation.
- Two requests were filed on 2013-04-30, and all of them withdrew.
- Three technologies were filed here: Geothermal, Solar and solar + battery.
- Five of the nine requests were still active at the end of the dataset, so this node's record is not settled.
What a decision record would have to make explicit
- A pattern across nine requests at one node is an observation about this node, not a rate that transfers elsewhere.
- Five requests are unresolved, so any comparison at this node has to stay open rather than concluded.
- The dataset records no withdrawal reasons, study costs or upgrade assignments, so those remain unknowns on this record.
What this does and does not show
This is a reading of a public dataset, not a customer case study: no engagement, customer or client is involved. The dataset records outcomes — what was built, what withdrew, and when — but not why any project withdrew, so no cause is attributed here. Nothing on this page claims GridVision predicted, influenced or would have changed any outcome, and a pattern at one point of interconnection does not generalise to another.
Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition — project-level interconnection queue dataset. Interconnection requests through year-end 2025. Used under CC BY 4.0; attribution to Lawrence Berkeley National Laboratory and GridTracker.
