PJM · Indiana
Bitter Ridge Wind Farm filed twice, and one of them was built.
Jay 138 kV
Eight interconnection requests since 2017: 1 reached commercial operation, 2 withdrew, 5 remain active.
- Built
- 1
- Withdrawn
- 2
- Still in queue
- 5
The queue record
Every interconnection request the dataset records at this point of interconnection, in filing order.
| Requested | Project | Technology | Capacity | Outcome |
|---|---|---|---|---|
| 2017-03-31 | Bitter Ridge Wind Farm | Wind | 130 MW | Built2020-09-05 · 3.4 yrs |
| 2020-01-30 | Rosegold Solar | Solar | 150 MW | Still in queue |
| 2020-04-29 | (unnamed) | Solar | 100 MW | Withdrawn2020-06-15 |
| 2020-05-06 | Bitter Ridge Wind Farm | Wind | 12.64 MW | Still in queue |
| 2020-07-13 | Sun Chief Solar Farm | Solar | 100 MW | Still in queue |
| 2021-03-31 | (unnamed) | Solar | 50 MW | Withdrawn2024-12-18 |
| 2022-03-10 | (unnamed) | Battery | 50 MW | Still in queue |
| 2023-03-02 | (unnamed) | Solar | 12 MW | Still in queue |
What the record shows
- Two of the eight requests at this node withdrew, and 475 MW of the 605 MW filed here never reached operation.
- The one project that reached operation, 130 MW of wind, took 3.4 years from request to commercial operation.
- Bitter Ridge Wind Farm appears two times in the queue at this node, filed between 2017 and 2020, of which one reached operation.
- Three technologies were filed here: Wind, Solar and battery.
- Five of the eight requests were still active at the end of the dataset, so this node's record is not settled.
What a decision record would have to make explicit
- A pattern across eight requests at one node is an observation about this node, not a rate that transfers elsewhere.
- Four of the eight requests are unnamed in the dataset, so nothing here can be attributed to a developer.
- Five requests are unresolved, so any comparison at this node has to stay open rather than concluded.
- The dataset records no withdrawal reasons, study costs or upgrade assignments, so those remain unknowns on this record.
What this does and does not show
This is a reading of a public dataset, not a customer case study: no engagement, customer or client is involved. The dataset records outcomes — what was built, what withdrew, and when — but not why any project withdrew, so no cause is attributed here. Nothing on this page claims GridVision predicted, influenced or would have changed any outcome, and a pattern at one point of interconnection does not generalise to another.
Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition — project-level interconnection queue dataset. Interconnection requests through year-end 2025. Used under CC BY 4.0; attribution to Lawrence Berkeley National Laboratory and GridTracker.