CAISO · Nevada / California · Public-record retrospective

Valley Switch 230 kV: interconnection queue history

Four of ten requests withdrew; six are still in the queue.

GridVision AI ResearchUpdated

Ten interconnection requests since 2023: 4 withdrew and 6 remain active.

Built
0
Withdrawn
4
Still in queue
6

The queue record

Every interconnection request the dataset records at this point of interconnection, in filing order.

Interconnection requests recorded at this point of interconnection, with request date, capacity and outcome.
RequestedProjectTechnologyCapacityOutcome
2023-04-17NelsonSolar103.74 MWStill in queue
2023-04-17ContainerSolar204.57 MWStill in queue
2023-04-17Nelson HillsSolar204.57 MWStill in queue
2023-04-17Grapevine 1Solar204.58 MWStill in queue
2023-04-17SerenitySolar305.41 MWStill in queue
2023-04-17Solar 373Solar + battery407 MWWithdrawn2024-12-02
2023-04-17White Oak SolarSolar + battery407 MWWithdrawn2025-05-27
2023-04-17BristleconeSolar + battery460.95 MWStill in queue
2023-04-17Titus CanyonSolar + battery532 MWWithdrawn2024-12-02
2023-04-17Ashton Energy CenterSolar + battery1026.67 MWWithdrawn2025-04-25

What the record shows

  • 2,373 MW of the 3,856 MW filed here withdrew.
  • The largest request filed here, 1,027 MW (solar + battery), withdrew 2.0 years after filing.
  • Ten requests were filed on 2023-04-17; 4 withdrew and 6 remain active.
  • None of the 4 withdrawals came within a year of filing; the quickest took 1.6 years.
  • By technology, the requests here were solar 5, solar + battery 5.
  • The longest-standing active request here was filed on 2023-04-17.
  • The dataset records this point of interconnection under two spellings, which are combined here.

What a decision record would have to make explicit

  • None of the resolved requests at this node reached operation, and the public record does not say why.
  • Six requests are unresolved, so the outcome counts at this node can still change.
  • The dataset records outcomes and dates, not reasons, so no cause is attributed to any outcome here.

What this does and does not show

This is a reading of a public dataset, not a customer case study: no engagement, customer or client is involved. The dataset records outcomes — what was built, what withdrew, and when — but not why any project withdrew, so no cause is attributed here. Nothing on this page claims GridVision predicted, influenced or would have changed any outcome, and a pattern at one point of interconnection does not generalise to another.

Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition — project-level interconnection queue dataset. Interconnection requests through year-end 2025. Used under CC BY 4.0; attribution to Lawrence Berkeley National Laboratory and GridTracker.