ISO-NE · Maine · Public-record retrospective
CMP Larrabee Road Station 345 kV: interconnection queue history
Twelve requests and 2,003 MW filed. None built.
GridVision AI ResearchUpdated
Twelve interconnection requests since 2015: 12 withdrew.
- Built
- 0
- Withdrawn
- 12
- Still in queue
- 0
The queue record
Every interconnection request the dataset records at this point of interconnection, in filing order.
| Requested | Project | Technology | Capacity | Outcome |
|---|---|---|---|---|
| 2015-11-03 | Wind | Wind | 216.410003662109 MW | Withdrawn2019-08-08 |
| 2015-11-03 | Wind | Wind | 245.380004882812 MW | Withdrawn2019-08-08 |
| 2015-11-12 | Battery Storage | Wind + battery | 25.079999923706 MW | Withdrawn2019-08-08 |
| 2015-11-12 | Battery Storage | Wind + battery | 52.2599983215332 MW | Withdrawn2019-08-08 |
| 2017-07-21 | Wind | Wind | 214.300003051757 MW | Withdrawn2018-04-12 |
| 2017-07-21 | battery storage additional (see Q664) | Wind + battery | 238.600006103515 MW | Withdrawn2018-04-12 |
| 2017-07-21 | Wind | Wind | 241.199996948242 MW | Withdrawn2018-04-12 |
| 2017-07-21 | Battery storage addition (see Q663) | Wind + battery | 265.600006103515 MW | Withdrawn2018-04-12 |
| 2018-04-12 | Battery storage addition (see Q746) | Wind + battery | 24.2999992370605 MW | Withdrawn2019-08-27 |
| 2018-04-12 | Battery storage addition (see Q745) | Wind + battery | 24.3999996185302 MW | Withdrawn2019-08-27 |
| 2018-04-12 | Wind | Wind | 214.300003051757 MW | Withdrawn2019-08-27 |
| 2018-04-12 | Wind | Wind | 241.199996948242 MW | Withdrawn2019-08-27 |
What the record shows
- 2,003 MW of the 2,003 MW filed here withdrew.
- The largest request filed here, 266 MW (wind + battery), withdrew 0.7 years after filing.
- Four requests were filed on 2018-04-12; all of them withdrew.
- Four of the 12 withdrawals came within a year of filing.
- By technology, the requests here were wind 6, wind + battery 6.
- The dataset records this point of interconnection under three spellings, which are combined here.
What a decision record would have to make explicit
- Every request at this node withdrew. The public record does not say why, so a new request here would have to rest on its own study evidence rather than on this history.
- The dataset records outcomes and dates, not reasons, so no cause is attributed to any outcome here.
What this does and does not show
This is a reading of a public dataset, not a customer case study: no engagement, customer or client is involved. The dataset records outcomes — what was built, what withdrew, and when — but not why any project withdrew, so no cause is attributed here. Nothing on this page claims GridVision predicted, influenced or would have changed any outcome, and a pattern at one point of interconnection does not generalise to another.
Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition — project-level interconnection queue dataset. Interconnection requests through year-end 2025. Used under CC BY 4.0; attribution to Lawrence Berkeley National Laboratory and GridTracker.
Related points of interconnection
- CAISO · CaliforniaColorado River Substation 230 kV16 requests · 3 built · 11 withdrawn · 2 still in queueRead the record
- CAISO · CaliforniaWindhub Substation 230 kV16 requests · 3 built · 8 withdrawn · 5 still in queueRead the record
- PJM · PennsylvaniaHatfield 500 kV6 requests · 3 built · 3 withdrawn · 0 still in queueRead the record
- CAISO · ArizonaHoodoo Wash Switchyard 500 kV13 requests · 2 built · 5 withdrawn · 6 still in queueRead the record
How the ISO-NE process works today: ISO-NE interconnection queue. Comparing candidate nodes for a project? Read how to choose a point of interconnection.