CAISO · California · Public-record retrospective
Tranquility 230 kV: interconnection queue history
Six of fourteen requests withdrew; eight are still in the queue.
GridVision AI ResearchUpdated
Fourteen interconnection requests since 2015: 6 withdrew and 8 remain active.
- Built
- 0
- Withdrawn
- 6
- Still in queue
- 8
The queue record
Every interconnection request the dataset records at this point of interconnection, in filing order.
| Requested | Project | Technology | Capacity | Outcome |
|---|---|---|---|---|
| 2015-04-30 | LUNA PRISM (FKA: MOON PRISM 2) | Battery | 19.94 MW | Withdrawn2018-05-17 |
| 2015-04-30 | LUNA VALLEY SOLAR | Solar + battery | 204 MW | Still in queue |
| 2015-04-30 | SCARLET | Solar + battery | 400 MW | Still in queue |
| 2016-05-02 | HEARTLAND SOLAR-2 | Solar | 1044.7625 MW | Withdrawn2017-03-13 |
| 2017-05-01 | HEARTLAND 1 | Solar + battery | 156.04 MW | Still in queue |
| 2017-05-01 | HEARTLAND 2 | Solar + battery | 156.05 MW | Still in queue |
| 2017-05-01 | SONRISA | Solar + battery | 200 MW | Still in queue |
| 2017-05-01 | GOLDEN SQUARE | Solar + battery | 205.39 MW | Withdrawn2018-04-20 |
| 2018-04-16 | HEARTLAND 3 | Solar + battery | 154.89 MW | Withdrawn2019-03-07 |
| 2018-04-16 | CASY SOLAR | Solar + battery | 203.5 MW | Withdrawn2019-05-07 |
| 2021-04-15 | PEACEFUL HOLLOW BESS | Battery | 100 MW | Still in queue |
| 2021-04-15 | CLARKSON | Solar + battery | 203.849 MW | Still in queue |
| 2021-04-15 | ELYSIAN | Solar + battery | 206.091 MW | Still in queue |
| 2023-04-17 | Heartland PV | Solar | 305 MW | Withdrawn2024-12-02 |
What the record shows
- 1,933 MW of the 3,560 MW filed here withdrew.
- The largest request filed here, 1,045 MW (solar), withdrew 0.9 years after filing.
- Four requests were filed on 2017-05-01; 1 withdrew and 3 remain active.
- Three of the 6 withdrawals came within a year of filing.
- By technology, the requests here were solar + battery 10, battery 2, solar 2.
- The longest-standing active request here was filed on 2015-04-30.
- The dataset records this point of interconnection under five spellings, which are combined here.
What a decision record would have to make explicit
- None of the resolved requests at this node reached operation, and the public record does not say why.
- Eight requests are unresolved, so the outcome counts at this node can still change.
- The dataset records outcomes and dates, not reasons, so no cause is attributed to any outcome here.
What this does and does not show
This is a reading of a public dataset, not a customer case study: no engagement, customer or client is involved. The dataset records outcomes — what was built, what withdrew, and when — but not why any project withdrew, so no cause is attributed here. Nothing on this page claims GridVision predicted, influenced or would have changed any outcome, and a pattern at one point of interconnection does not generalise to another.
Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition — project-level interconnection queue dataset. Interconnection requests through year-end 2025. Used under CC BY 4.0; attribution to Lawrence Berkeley National Laboratory and GridTracker.
Related points of interconnection
- CAISO · CaliforniaColorado River Substation 230 kV16 requests · 3 built · 11 withdrawn · 2 still in queueRead the record
- CAISO · CaliforniaWindhub Substation 230 kV16 requests · 3 built · 8 withdrawn · 5 still in queueRead the record
- CAISO · CaliforniaWhirlwind Substation 230 kV23 requests · 6 built · 10 withdrawn · 7 still in queueRead the record
- CAISO · CaliforniaOtay Mesa Switchyard 230 kV14 requests · 6 built · 5 withdrawn · 3 still in queueRead the record
How the CAISO process works today: CAISO interconnection queue. Comparing candidate nodes for a project? Read how to choose a point of interconnection.