CAISO · California · Public-record retrospective
Los Banos 500 kV: interconnection queue history
Eleven of thirteen requests withdrew; two are still in the queue.
GridVision AI ResearchUpdated
Thirteen interconnection requests since 2021: 11 withdrew and 2 remain active.
- Built
- 0
- Withdrawn
- 11
- Still in queue
- 2
The queue record
Every interconnection request the dataset records at this point of interconnection, in filing order.
| Requested | Project | Technology | Capacity | Outcome |
|---|---|---|---|---|
| 2021-04-15 | WINGTIP SOLAR 2 | Solar + battery | 561.5 MW | Withdrawn2023-01-30 |
| 2021-04-15 | WINGTIP SOLAR 1 | Solar + battery | 1176.1 MW | Still in queue |
| 2023-04-17 | Copper Cloud | Battery | 200 MW | Withdrawn2025-12-03 |
| 2023-04-17 | Foothills | Solar + battery | 206 MW | Withdrawn2024-12-02 |
| 2023-04-17 | Mystic Ridge | Solar + battery | 206.1 MW | Withdrawn2025-12-04 |
| 2023-04-17 | Foothills (Formly Spring Bath Hybrid) | Solar + battery | 208 MW | Withdrawn2024-12-02 |
| 2023-04-17 | CRESTLEY | Battery | 270 MW | Withdrawn2025-12-03 |
| 2023-04-17 | Lotus 3 | Battery | 400 MW | Withdrawn2024-12-02 |
| 2023-04-17 | Silkie | Battery | 400 MW | Withdrawn2025-12-03 |
| 2023-04-17 | Carissalito Creek | Solar + battery | 415.86 MW | Still in queue |
| 2023-04-17 | Leopard Storage | Battery | 458.703 MW | Withdrawn2025-05-29 |
| 2023-04-17 | Baca | Battery | 490.734 MW | Withdrawn2025-12-01 |
| 2023-04-17 | Greyhound Storage | Battery | 1000 MW | Withdrawn2024-12-02 |
What the record shows
- 4,401 MW of the 5,993 MW filed here withdrew.
- The largest request filed here, 1,176 MW (solar + battery), was filed in 2021 and is still active.
- Eleven requests were filed on 2023-04-17; 10 withdrew and 1 remains active.
- None of the 11 withdrawals came within a year of filing; the quickest took 1.6 years.
- By technology, the requests here were battery 7, solar + battery 6.
- The longest-standing active request here was filed on 2021-04-15.
- The dataset records this point of interconnection under four spellings, which are combined here.
What a decision record would have to make explicit
- None of the resolved requests at this node reached operation, and the public record does not say why.
- Two requests are unresolved, so the outcome counts at this node can still change.
- The dataset records outcomes and dates, not reasons, so no cause is attributed to any outcome here.
What this does and does not show
This is a reading of a public dataset, not a customer case study: no engagement, customer or client is involved. The dataset records outcomes — what was built, what withdrew, and when — but not why any project withdrew, so no cause is attributed here. Nothing on this page claims GridVision predicted, influenced or would have changed any outcome, and a pattern at one point of interconnection does not generalise to another.
Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition — project-level interconnection queue dataset. Interconnection requests through year-end 2025. Used under CC BY 4.0; attribution to Lawrence Berkeley National Laboratory and GridTracker.
Related points of interconnection
- CAISO · CaliforniaColorado River Substation 230 kV16 requests · 3 built · 11 withdrawn · 2 still in queueRead the record
- CAISO · CaliforniaWindhub Substation 230 kV16 requests · 3 built · 8 withdrawn · 5 still in queueRead the record
- CAISO · CaliforniaWhirlwind Substation 230 kV23 requests · 6 built · 10 withdrawn · 7 still in queueRead the record
- CAISO · CaliforniaOtay Mesa Switchyard 230 kV14 requests · 6 built · 5 withdrawn · 3 still in queueRead the record
How the CAISO process works today: CAISO interconnection queue. Comparing candidate nodes for a project? Read how to choose a point of interconnection.