CAISO · California · Public-record retrospective
Los Banos 230 kV: interconnection queue history
Eight of eleven requests withdrew; three are still in the queue.
GridVision AI ResearchUpdated
Eleven interconnection requests since 2017: 8 withdrew and 3 remain active.
- Built
- 0
- Withdrawn
- 8
- Still in queue
- 3
The queue record
Every interconnection request the dataset records at this point of interconnection, in filing order.
| Requested | Project | Technology | Capacity | Outcome |
|---|---|---|---|---|
| 2017-05-01 | LAS CAMAS 1 | Solar + battery | 102.5 MW | Still in queue |
| 2017-05-01 | LAS CAMAS 2 | Solar | 102.5 MW | Withdrawn2018-04-18 |
| 2018-04-16 | LAS CAMAS 3 | Solar + battery | 102.5 MW | Still in queue |
| 2021-04-15 | LAS CAMAS 4 | Battery | 100 MW | Withdrawn2025-09-04 |
| 2021-04-15 | AUSTRALIS | Solar + battery | 307 MW | Still in queue |
| 2023-04-17 | Glacier Point | Battery | 102.79978 MW | Withdrawn2024-12-02 |
| 2023-04-17 | Horsetail Falls | Battery | 102.79978 MW | Withdrawn2024-12-02 |
| 2023-04-17 | Tuolumne Meadows | Battery | 102.79978 MW | Withdrawn2024-12-02 |
| 2023-04-17 | Ramos | Gas + battery | 130 MW | Withdrawn2024-12-02 |
| 2023-04-17 | Alembic | Gas + battery | 152 MW | Withdrawn2024-12-02 |
| 2023-04-17 | Badger Flat | Battery | 310 MW | Withdrawn2024-12-02 |
What the record shows
- 1,103 MW of the 1,615 MW filed here withdrew.
- The largest request filed here, 310 MW (battery), withdrew 1.6 years after filing.
- Six requests were filed on 2023-04-17; all of them withdrew.
- One of the 8 withdrawals came within a year of filing.
- By technology, the requests here were battery 5, solar + battery 3, gas + battery 2, solar 1.
- The longest-standing active request here was filed on 2017-05-01.
- The dataset records this point of interconnection under three spellings, which are combined here.
What a decision record would have to make explicit
- None of the resolved requests at this node reached operation, and the public record does not say why.
- Three requests are unresolved, so the outcome counts at this node can still change.
- The dataset records outcomes and dates, not reasons, so no cause is attributed to any outcome here.
What this does and does not show
This is a reading of a public dataset, not a customer case study: no engagement, customer or client is involved. The dataset records outcomes — what was built, what withdrew, and when — but not why any project withdrew, so no cause is attributed here. Nothing on this page claims GridVision predicted, influenced or would have changed any outcome, and a pattern at one point of interconnection does not generalise to another.
Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition — project-level interconnection queue dataset. Interconnection requests through year-end 2025. Used under CC BY 4.0; attribution to Lawrence Berkeley National Laboratory and GridTracker.
Related points of interconnection
- CAISO · CaliforniaColorado River Substation 230 kV16 requests · 3 built · 11 withdrawn · 2 still in queueRead the record
- CAISO · CaliforniaWindhub Substation 230 kV16 requests · 3 built · 8 withdrawn · 5 still in queueRead the record
- CAISO · CaliforniaWhirlwind Substation 230 kV23 requests · 6 built · 10 withdrawn · 7 still in queueRead the record
- CAISO · CaliforniaOtay Mesa Switchyard 230 kV14 requests · 6 built · 5 withdrawn · 3 still in queueRead the record
How the CAISO process works today: CAISO interconnection queue. Comparing candidate nodes for a project? Read how to choose a point of interconnection.