CAISO · Arizona / California · Public-record retrospective
Delaney Substation 500 kV: interconnection queue history
Seven of ten requests withdrew; three are still in the queue.
GridVision AI ResearchUpdated
Ten interconnection requests since 2018: 7 withdrew and 3 remain active.
- Built
- 0
- Withdrawn
- 7
- Still in queue
- 3
The queue record
Every interconnection request the dataset records at this point of interconnection, in filing order.
| Requested | Project | Technology | Capacity | Outcome |
|---|---|---|---|---|
| 2018-04-16 | PITCHFORK ENERGY | Solar + battery | 513.5 MW | Withdrawn2019-03-08 |
| 2020-04-15 | PAPAGO | Solar + battery | 307.188 MW | Withdrawn2021-03-19 |
| 2020-04-15 | HARQUAHALA SUNRISE | Solar + battery | 308.926 MW | Still in queue |
| 2020-04-15 | ARIZONA A1 | Solar + battery | 2072.52 MW | Withdrawn2021-05-03 |
| 2021-04-15 | HARQUAHALA SUNRISE 2 | Solar + battery | 169.2 MW | Still in queue |
| 2021-04-15 | HARQUAHALA FLATS 2 | Solar + battery | 410.76 MW | Still in queue |
| 2021-04-15 | PRIMROSE HYBRID | Solar + battery | 458.659 MW | Withdrawn2021-08-12 |
| 2023-04-17 | Salome | Solar + battery | 320 MW | Withdrawn2024-12-02 |
| 2023-04-17 | Belmont | Solar + battery | 626 MW | Withdrawn2024-12-02 |
| 2023-04-17 | Harquahala Sunrise 3 | Solar + battery | 1037 MW | Withdrawn2024-12-02 |
What the record shows
- 5,335 MW of the 6,224 MW filed here withdrew.
- The largest request filed here, 2,073 MW (solar + battery), withdrew 1.0 years after filing.
- Three requests were filed on 2023-04-17; all of them withdrew.
- Three of the 7 withdrawals came within a year of filing.
- The longest-standing active request here was filed on 2020-04-15.
- The dataset records this point of interconnection under three spellings, which are combined here.
What a decision record would have to make explicit
- None of the resolved requests at this node reached operation, and the public record does not say why.
- Three requests are unresolved, so the outcome counts at this node can still change.
- The dataset records outcomes and dates, not reasons, so no cause is attributed to any outcome here.
What this does and does not show
This is a reading of a public dataset, not a customer case study: no engagement, customer or client is involved. The dataset records outcomes — what was built, what withdrew, and when — but not why any project withdrew, so no cause is attributed here. Nothing on this page claims GridVision predicted, influenced or would have changed any outcome, and a pattern at one point of interconnection does not generalise to another.
Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition — project-level interconnection queue dataset. Interconnection requests through year-end 2025. Used under CC BY 4.0; attribution to Lawrence Berkeley National Laboratory and GridTracker.
Related points of interconnection
- CAISO · CaliforniaColorado River Substation 230 kV16 requests · 3 built · 11 withdrawn · 2 still in queueRead the record
- CAISO · CaliforniaWindhub Substation 230 kV16 requests · 3 built · 8 withdrawn · 5 still in queueRead the record
- CAISO · ArizonaHoodoo Wash Switchyard 500 kV13 requests · 2 built · 5 withdrawn · 6 still in queueRead the record
- CAISO · CaliforniaWhirlwind Substation 230 kV23 requests · 6 built · 10 withdrawn · 7 still in queueRead the record
How the CAISO process works today: CAISO interconnection queue. Comparing candidate nodes for a project? Read how to choose a point of interconnection.