Nine interconnection requests since 2004: 7 withdrew and 2 remain active.
- Built
- 0
- Withdrawn
- 7
- Still in queue
- 2
The queue record
Every interconnection request the dataset records at this point of interconnection, in filing order.
| Requested | Project | Technology | Capacity | Outcome |
|---|---|---|---|---|
| 2004-05-24 | TULE WIND | Wind + battery | 127.6 MW | Still in queue |
| 2006-06-06 | TECATE HYBRID | Solar + battery | 50 MW | Withdrawn2019-12-04 |
| 2010-02-01 | MANZANITA WIND | Wind | 57.5 MW | Withdrawn2015-11-23 |
| 2011-03-31 | TIERRA DEL SOL SOLAR FARM | Solar | 45 MW | Withdrawn2015-02-19 |
| 2012-04-02 | TIERRA DEL SOL II | Solar | 15 MW | Withdrawn2015-02-19 |
| 2012-04-02 | LOS ROBLES | Solar | 100 MW | Withdrawn2013-03-25 |
| 2014-04-30 | SLW (FKA SHU'LUUK WIND) | Wind | 160 MW | Withdrawn2015-04-01 |
| 2021-04-15 | DESERT JEWEL STORAGE | Battery | 206.31 MW | Still in queue |
| 2023-04-17 | Boulevardier | Battery | 199 MW | Withdrawn2024-12-02 |
What the record shows
- 626 MW of the 960 MW filed here withdrew.
- The largest request filed here, 206 MW (battery), was filed in 2021 and is still active.
- Two requests were filed on 2012-04-02; all of them withdrew.
- Two of the 7 withdrawals came within a year of filing.
- By technology, the requests here were solar 3, battery 2, wind 2, solar + battery 1, wind + battery 1.
- The longest-standing active request here was filed on 2004-05-24.
- The dataset records this point of interconnection under three spellings, which are combined here.
What a decision record would have to make explicit
- None of the resolved requests at this node reached operation, and the public record does not say why.
- Two requests are unresolved, so the outcome counts at this node can still change.
- The dataset records outcomes and dates, not reasons, so no cause is attributed to any outcome here.
What this does and does not show
This is a reading of a public dataset, not a customer case study: no engagement, customer or client is involved. The dataset records outcomes — what was built, what withdrew, and when — but not why any project withdrew, so no cause is attributed here. Nothing on this page claims GridVision predicted, influenced or would have changed any outcome, and a pattern at one point of interconnection does not generalise to another.
Source: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition — project-level interconnection queue dataset. Interconnection requests through year-end 2025. Used under CC BY 4.0; attribution to Lawrence Berkeley National Laboratory and GridTracker.
Related points of interconnection
- CAISO · CaliforniaColorado River Substation 230 kV16 requests · 3 built · 11 withdrawn · 2 still in queueRead the record
- CAISO · CaliforniaWindhub Substation 230 kV16 requests · 3 built · 8 withdrawn · 5 still in queueRead the record
- CAISO · CaliforniaWhirlwind Substation 230 kV23 requests · 6 built · 10 withdrawn · 7 still in queueRead the record
- CAISO · CaliforniaOtay Mesa Switchyard 230 kV14 requests · 6 built · 5 withdrawn · 3 still in queueRead the record
How the CAISO process works today: CAISO interconnection queue. Comparing candidate nodes for a project? Read how to choose a point of interconnection.