Grid Monitor
ISO New England · Real-Time System Load
Offline
Current Load
24-Hour Peak
MW · Max in window
24-Hour Valley
MW · Min in window
Alert Status
No active alerts
Grid Health Score
24-Hour Load Trend
No readings available — data sync required
AI Grid Alerts
Forecast Dashboard
Model future electrical load growth and receive risk assessments with capacity recommendations.
Forecast Inputs
Configure parameters for your service territory
Forecasted Load
1,066.9 MW
Boston · +25.5% increase
Risk Level
HIGH
>25% load increase
Current Baseline
850 MW
Peak demand today
Load Contribution Breakdown
Population Growth20.4 MW
EV Adoption76.5 MW
Data Centers120 MW
Capacity Recommendation
Based on HIGH risk classification
Immediate action required. Accelerate substation upgrades and consider 217 MW of new capacity by year 3.